CICEET Progress Report for the period 2/1/02 through 7/31/02
Project Title: Inflow Loadings from Ground Water to the Great Bay Estuary
Principal Investigator(s): Larry K. Brannaka, Thomas P. Ballestero,
Tom Mack (USGS), and Rob Roseen
Accomplishments
Scheduled Tasks:
The primary efforts for this project are completed. Minor efforts were required for writing a several page project summary to be sent to project participants, including information gathered for the respective homeowner wells. Additional efforts included contracting with the US Geological Survey for publication of an Open File Report entitled, Groundwater Potentiometric Surface For Bedrock Aquifer Of Area Immediately Surrounding Great Bay, Southeastern New Hampshire.
Progress on Tasks
The project summary and thank you letter to project participants has been written, and arrangements are being made to distribute. An agreement was made with the USGS and UNH to fund a single open file report entitled Groundwater Potentiometric Surface For Bedrock Aquifer Of Area Immediately Surrounding Great Bay, Southeastern New Hampshire. The report will include one plate, a black and white map with flow vectors and contours. Legend description will include a brief description of methods, a table of well statistics (lat, long, WSEL, ELTOC, etc), acknowledgments of the private homeowners, participants, and funding sources.
UNH will provide data (already generated form this project) from which to base the report including a brief description of methods, a table of well statistics (lat, long, WSEL, ELTOC, etc), acknowledgments of the private homeowners, participants, and funding sources.
The agreement is for UNH to fund up to $4,000 for a publication of total cost $8,000. There will be a 50% match on this publication, $4,000 from USGS, and $4,000 from UNH to the USGS sent upon completion of publication.
Difficulties Encountered
None to report.
Anticipated Success in Meeting Project Objectives in Scheduled Project Period
Project objectives will be met on time.
Preliminary Results
None to report.
Tasks and activities for next reporting period
Tasks for the next reporting period
This was the final reporting period. The next report to follow is the final report.
Work plan to accomplish tasks
Data has been reviewed and report preparation is underway.
Concerns or difficulties
None
Expenditures
Expenditures were in the range anticipated for the work accomplished to date.
|